The quilt has grown as much as it's going to! I've now quilted in the ditch around each block to stabilise it. I want to have a session or two with pencil and paper free-hand drawing - possibly leaves - to try them on the blocks. I won't manage to 'draw' them with the sewing machine if I can't do it with a pencil!
Sunday, 17 January 2010
Growing fast
Thursday, 14 January 2010
Sowing and sewing
Here are the onions. They have been through for several days. It's wonderful to have a few seeds up - a sign of hope in the dark, snowy, slushy, mucky days before spring.
I have got my quilt top together and it's 92" square. As the largest wadding I have is 90" square, I've had to place an order. I've also ordered a length of 108" wide backing, in pale yellow with blue highlights - just the job! They are coming from http://www.asding.com - a treasure trove of stuff for finishing your quilts - waddings, backing fabrics, threads and much more.
Saturday, 9 January 2010
Today's visitor
Rubbish pic as it's through the window as dusk was setting in - but there were two of these lovely male bullfinches in the garden this afternoon. This chap is sitting on a hanging bird-bath. When I dashed for the camera they were both on it. These are the two that can usually be found on the corner of the lane.Friday, 8 January 2010
Staying in!
After telling QuiltSue on a previous comment, that the body of the current quilt is 64" sq I got off me bum and measured it to find that the squares are 9" not 8", so it's actually 72" sq. I wanted a contrast border, but not one of the colours in the quilt - which left me with black and white which won't clash with anything! There's an inner border of creamy colours, the black and white major border then another creamy one. The intention is to make a final bright yellow border, like the cream ones. Binding in blue?
Tuesday, 5 January 2010
Snow on snow ..
There was no chance of doing anything outside - the snow fell from dawn until around 2.00 p.m. This being the case I decided to get the sowing machine out.
I've been making this quilt on and off for nearly 2 years. I broke off to make several baby quilts when I'd just started making up the blocks. At that point we began to sort out the spare bedroom and had the floor laminated and I decorated it. Since then we've been waiting for a local chap to make me a workbench with storage underneath. I'm getting fed up of the wait now. I think I'll ring him with an ultimatum!
Close up of the blocks. It's a 2 block pattern and I'm currently cogitating upon borders, how many, what style etc. I shall have a think!
Saturday, 2 January 2010
Grand Designs
I began the year with a walk around the allotment to make plans for what will go where once the ground is unfrozen and the sowing and planting seasons are underway. There are still some leeks to be eaten - once I can lift them without bending the fork tines - and on the old plot, the oca is now in a suitably frazzled state that I think I can lift and store the tubers - again when I can get at them.
With an eye to the future I got my stored potato tubers out of the salad drawer of the fridge. These are the tubers of the two varieties I selected after growing some from true seed - the little 'potato apple' that follows on from the flowers. The original plant here was Salad Blue and the colour (anthocyanin, I think) is a trait that all the offspring carried in some degree. Amethyst, to the left, kept the deep purple colour when boiled or steamed in their skins, then peeled when cool, to use in potato salad (which was my aim). Purple Heart, on the right, turned a pale, cloudy white/grey colour. Not particularly attractive until you cut the spud in half and each one had a deep purple centre with the off-white surround. Both of these had an excellent flavour. I'm growing them on this year so they are now in the above chocolate box - Christmas present already finished! They are in the spare room to chit. I think I'll put one or two of each into big pots and bubble wrap them in the cold greenhouse for an early crop. The rest will go in the ground.
Friday, 1 January 2010
New year, new snowfall

